Map for Ongoing Work

METRO WING

          Metro wing is headed by a Chief Engineer with a Circle and five Divisions.

It was formed for implementing the transport infrastructure facilities in and around Chennai Metropolitan Area (CMA) as envisaged in the CTTS, and Second Master Plan developed by Chennai Metropolitan Development Authority (CMDA) through the State budgetary resource under the Chennai Metropolitan Development Plan (CMDP) Scheme.

          The road network improvement plans such as Grade-separators, High level bridges, Widening of roads/ bridges, Formation of new link roads, Foot Over Bridges (FOB), Skywalks, etc are being implemented by this wing under CMDP scheme.

          Further, Construction/Widening of Road Over Bridges/Road Under Bridges within the CMA, under Railway Works Programme (RWP) on cost sharing basis are taken up by this wing.

The projects are as follows:-

STATE FUNDED SCHEMES CHENNAI METROPOLITAN DEVELOPMENT PLAN (CMDP)

GRADE SEPARATORS

Sl. No Nomenclature Cost (Rs. in Crore)
Work In Progress

1

Construction of a Grade Separator at the intersection of Sandhai road and Kundrathur road with GST road at Pallavaram

82.66

2

Construction of a Grade Separator at the intersection of Taramani road, Tambaram – Velachery road and Velachery bypass road at Velachery Vijayanagaram.

108.00

3

Construction of Grade Separator in Jawaharlal Nehru Salai (Inner Ring Road) at the junction of Kaliamman Koil Street and City bus entrance of CMBT at Koyambedu Chennai

93.50

4

Construction of a Grade Separator connecting Medavakkam– Sholinganallur road junction, Medavakkam – Mambakkam road junction and Mount – Medavakkam Road junction in Marmalong Bridge – Irumbuliyur road at Medavakkam

146.41

5

Construction of Grade Separator at the intersection of Mount - Medavakkam road and Pallavaram -Thuraipakkam road near Kilkattalai

64.00

6

Construction of a Grade Separator in the Right Hand side in Kolathur Rettai Eri at the junction of Perambur – Redhills road and Inner Ring Road.

41.08

Work in Land Acquisition Stage

7

Construction of a Grade Separator at the junction of ECR–Lattice Bridge Road at Thiruvanmiyur (LA Only)

58.00

TOTAL

593.65

RIVER BRIDGES

Sl. No Nomenclature Cost (Rs. in Crore)
 

Works In Progress

 

1

Construction of High Level Bridge across buckhingham canal at Km 0/6 of Thiruvotriyur – Ponneri – Panchetty road

58.64

Land Acquisition in Progress

 

2

Construction of High Level Bridge across Coovum river at Nolambur road junction in NH 4. ( LA only)

36.00

3

Construction of High Level Bridge across Coovum river connecting Km 14/4 of Mount –Poonamallee - Avadi road and Paruthipattu - Thiruverkadu Municipal Road.( LA only)

7.40

     

Total

102.04

FORMATION OF NEW LINK / WIDENING OF ROAD WORKS:

Sl. No Nomenclature Cost (Rs. in Crore)

Land Acquisition in Progress

 

1

Formation of Tambaram Eastern bypass Road Km 0/0 – 8/4 (LA only)

75.50

2

Forming Six lane of ECR from Km 11/8 - 23/2 from Thiruvanmiyur to Akkarai ( LA only)

778.00

3

Forming link road and construction of Bridge across Buckingham canal connecting Rajiv Gandhi Salai and East Coast Road at Neelankarai

204.20

 

Work In progress

 

4

Formation of Tambaram Eastern by-pass road Km 5/450 – 8/080

36.69

     

GRAND TOTAL

1094.39

SKYWALK

Skywalk is an elevated walkway built over a road, linking two or more locations. It serves as a pertinent solution for safe & secured pedestrian crossing.

To connect the Railway station and bus terminals in Tambaram, construction of Foot Over Bridge and Skywalk with escalator at Km 25/6 of GST Road, Tambaram was taken up as a spillover work and is in progress for Rs.19.75 Crore.

Further, the work of Providing Skywalk, Escalator and other accessories connecting East Tambaram to West Tambaram is in DPR stage.

WORKS ADMINISTRATIVELY SANCTIONED DURING 2019-20

Sl. No Nomenclature Cost (Rs. in Crore)
Land Alienation in Progress

1

Formation of New Link Road connecting Greenways Road(DGS Dhinakaran Salai) with Durgabhai Deshmukh road through TamilNadu Music College

22.84

Estimate Stage

2

Construction of High Level Bridge across Coovum river connecting Km 14/4 of Mount –Poonamallee - Avadi road and Paruthipattu- Thiruverkadu Municipal Road.

16.784

3

Construction of Grade Separator at the intersection of Lattice Bridge Road and East Coast Road at Thiruvanmiyur junction

219.92

4

Widening the East Coast Road (ECR) to Six lane from Km 14/550 – 15/700 at Palavakkam Village

15.85

5

Formation of Tambaram Eastern Bypass road branching from Km Km 3/900 – 5/450.

52.61

TOTAL

328.00

Also, two DPR projects and seven DFR projects have been sanctioned for an amount of Rs.222.87 lakhs and are in progress. The details of the projects are as follows.

Preparation of DPR for the works of:

  • Construction of Grade Separator in Chennai-Thiruvallur High Road at the junction of Ambattur Estate bus depot.
  • Construction of Foot Over Bridge in Thirumangalam-Mugappair road near DAV and Velammal School.
  • Preparation of DFR for :

    • Forming bund road along Adyar River Bunds from T.V.Ka. Bridge to Maraimalai Adigalar Bridge at Saidapet.
    • Decongestion of traffic from Halda Junction to Light House via Sardar Patel Road, Adyar, Greenways Road and Santhome High Road.
    • To decongest the traffic in Kodambakkam- Sriperumbudur road (From Vadapalani Junction to Porur)
    • To decongest traffic in Velachery High Road (from Chinnamalai to Velachery Bypass junction)
    • To decongest the traffic at the junction of Chennai-Thirutani -Renigunda Road and Chennai Bypass road near Ambattur telephone exchange
    • To decongest the traffic at Basin Bridge Junction at Km 3/500 of GNT road (Wall Tax road)
    • To decongest the traffic at Vyasarpadi junction near Ambedkar Law College

    CHENNAI CITY TRAFFIC DECONGESTION PROJECT (CCTDP)

    In order to relieve the traffic congestion at various junctions in Chennai Metropolitan Area (CMA), 18 projects are proposed to be taken up under Chennai City Traffic Decongestion Project (CCTDP). Initially, sanction for an amount of Rs.1121.57 Crore has been accorded for Land Acquisition.

    The project details are listed below and all the 18 works are in DPR stage.

    Sl. No Nomenclature Cost (Rs. in Crore)

    1

    Construction of Grade Separator at the Junction of Rajiv Gandhi Salai with Sardar Patel road at Madhya Kailash.

    46.90

    2

    Construction of Foot Over Bridge at Km 9/300 in Inner Ring road near Kendriya Vidyala School (No Land Acquisition Involved)

    -

    3

    Providing Skywalk, Escalator and other accessories connecting East Tambaram to West Tambaram with Multi Model Integration connectivity to existing Bus stand, Tambaram Railway station including improvements to existing Bus stand

    6.00

    4

    Widening the existing Road Over Bridge at Km 12/2-13/2 in the Inner Ring Road (Dual five lane) (No Land Acquisition Involved)

    -

    5

    Construction of Grade Separator at the Junction of Km 4/2 of Madhavaram Redhills road and Km 19/100 of Inner Ring Road.

    30.51

    6

    Construction of High Level Bridge across Coovam river at Padikuppam in lieu of existing bed level causeway connecting Padikuppam road to Poonamallee High Road

    2.00

    7

    Construction of Grade Separator at Km 4/4 of Inner Ring Road and P.T.Rajan Salai Junction.

    33.79

    8

    Construction of Grade Separator at Km 6/5 of Marmalong Bridge – Irumbuliyur road near Kaiveli, Madipakkam

    20.00

    9

    Construction of Grade separator at Marmalong Bridge- Irumbuliyur Road covering Madampakkam road Junction, Tambaram Eastern Bypass and Camp Road Junction near Selaiyur

    103.00

    10

    Construction of Grade Separator at the intersection of ECR and Kalaignar Karunanidhi salai at Akkarai.

    122.94

    11

    Construction of Vehicular Underpass at the junction of Mount Medavakkam road & Southern sector of Inner Ring Road near Madipakkam

    36.25

    12

    Construction of Multi level Grade Separator on Mount-Poonamallee-Avadi road from MIOT Hospital to Mugalivakkam via Ramapuram, L&T and DLF

    33.60

    13

    Construction of Grade Separator at Km 80/7 in Chennai – Thiruthani – Renigunta Road and Korattur Road.

    191.00

    14

    Providing Four lane Grade Separator at Km. 76/8 of Chennai-Thiruthani-Renigunta Road at the junction of Km.6/4 of Vanagaram – Ambattur Road

    136.80

    15

    Construction of Grade Separator at the Intersection of Kodambakkam -Sriperumbudur road and Poonamallee - Kundrathur - Pallavaram Road, including providing connectivity to ORR via Erikkarai Road at Kundrathur

    118.00

    16

    Construction of Grade Separator along Chennai - Thiruthani - Renigunta Road at the intersection of Mount Poonamallee Avadi Road at Km 68/2 and at the intersection of Heavy Vehicles Factory Road at Km 69/0 at Avadi

    70.88

    17

    Construction of Road Over Bridge at Km 75/6 of Chennai – Thiruttani- Renigunta Road (SHU148) in lieu of existing two lane ROB

    13.50

    18

    Construction of Grade Separator at the intersection of Mount - Poonamallee - Avadi road, Chennai – Chittoor - Bangalore road & Poonamallee - Kundrathur- Pallavaram road at Kattupakkam in Poonamallee.

    156.40

    TOTAL

    1121.57

RAILWAY WORKS PROGRAMME (RWP):

ROB/ RUBs WITHIN CMA:

Sl. No Nomenclature Cost (Rs. in Crore)
Works in Progress

1

LC No.4 - Construction of RUB near Korattur Railway station

21.96

2

LC No.32 - Construction of ROB near Perungalathur Railway station

206.08

3

LC No.27 - Construction of Limited Use Subway near Chrompet Radha Nagar.

28.99

Works in LA & DPR Stage

4

LC No.14 - Construction of ROB near Veppampattu Railway station (LA)

29.50

5

LC No.4 - Construction of RUB near Tiruvottiyur - Ennore Railway stations.(DPR &LA)

28.00

6

LC No.6 - Construction of RUB near Tiruvottiyur - Wimco Nagar Railway stations.(DPR)

25.50

7

LC No.16 - Construction of ROB near Nandhiyambakkam - Minjur Railway stations.(DPR &LA)

28.32

8

LC No.22 - Construction of RUB near Tirusulam.(DPR)

14.00

TOTAL

382.35

Further, the work of Construction of ROB at Km 75/6 of Chennai – Thiruttani- Renigunta Road was proposed to be taken up under CCTDP.

WIDENING OF ROBS WITHIN CMA:

As the width of the existing ROB in the following locations is in-sufficient for the present day traffic requirements, widening is proposed.

  • Widening the existing ROB at Km 20/8 of Mount - Poonamallee - Avadi road at a cost of Rs.11.03 Crore has been sanctioned and is under consideration in Railways for inclusion in Railway Works Programme on cost sharing basis.
  • Widening the existing ROB at km 12/2-13/2 of Inner Ring Road (Dual Five lane) in DPR stage was proposed to be included in CCTDP.